How to use the windrower properly

Install the unit according to the instructions and increase the air intake pipe by 35cm. Lubricate each lubrication point and perform trial operation (first run at low speed for several minutes, then switch to medium speed operation).

After the test run, stop to check whether the bearing overheating; dynamic, fixed blade, blade and friction plate clearance is appropriate; correct alignment is correct, the rivets, bolts and other loose. Then fully lubricate the windrower once. Level the road, fill in the horizontal trenches in the field, straighten out the ravine, and cut the ground to the top of the plot. Cut out the 1m paved area on the ground.

Before unit operation, idle for a few minutes and confirm that all departments are working properly before starting work. The start should be steady and it is forbidden to bang the throttle. Select the appropriate operating speed based on crop production and harvest time. In general, high crop yields, high moisture content, and in the morning, should be used in low gear; when crop yields are low and moisture content is low, high gears should be used. During operation, no change in throttle size or use of a clutch to control the speed of the vehicle may occur in order to avoid clogging and damage to the machine. If you need to adjust the speed of operation, it should be achieved through the shift position. If it is found that there is a blockage, the power should be cut off and the operation should be eliminated after troubleshooting.

The choice of harvesting route. Normal crops can be harvested in a circle or two-way arrangement; crops are laid down, reversible in the direction of lodging, or in the direction of 45 with the lodging crops. When windy, they should be harvested against the wind or cut perpendicular to the direction of the wind and laid in the wind. If full-scale operations are not possible, crops should be harvested on the output side. When it is necessary to adjust the direction of advancement, it should be slowly turned so as not to swivel the head of the table, and the abutment device will pull the crop down.

In the harvesting process, if reversing is needed, the header must be raised; when the unit turns, it should cut off the power, slow down after lifting the header, lower the header after the turn, combine the power, and after the standby group is running normally, the harvester will resume; When the unit needs to transfer the land, it should raise the header to the highest position, lock it with the interlock device, drive at medium or low speed, and avoid collision.

After the end of each day's work, the headers should be placed on pre-prepared bricks or blocks, and then parked and cannot be placed in suspension.